Door Sealing Strip

Name :Door Sealing Strip

Products category: rubber extrusion product

Material: EPDM,NR,SBR,Nitrile, Silicone, Fluorosilicone, Neoprene, Urethane(PU), Polyacrylate(ACM), Ethylene Acrylic(AEM),  HNBR, Butyl(IIR), plastic like material (TPE, PU, NBR, silicone, NBR+TPE etc)

Size :All size and thickness available.





CONTACT NOW download

Details

Tags

lntroduction

 

What is door seal strip?

 

The weather stripping is generally adhered to the doorframe, so that when the door is closed, light and air are unable to leak through the opening. The materials are strategically sized and placed in order to eliminate any gaps that would otherwise be present when your door is closed.

 

Product Description

Products

Name

Rubber Extrusion Profile

Products category

rubber extrusion product

Material

EPDM,NR,SBR,Nitrile, Silicone, Fluorosilicone, Neoprene, Urethane(PU), Polyacrylate(ACM), Ethylene Acrylic(AEM),  HNBR, Butyl(IIR), plastic like material (TPE, PU, NBR, silicone, NBR+TPE etc)

Size

All size and thickness available.

Shape

capable of all shapes as per drawing

Color

Natural,black, Pantone code or RAL code, or as per client's samples or requirements

Hardness

20°~90° Shore A, usually 30°~80° Shore A.

Surface finishing

Texture (VDI/MT standard, or made to client's sample), polished (high polish, mirror polish), smooth, painting, powder coating, printing, electroplating etc.

Drawing

2D or 3D draiwng in any image/picture format is OK

Free sample

Yes

OEM/ODM

OEM/ODM

Application

Household, electronics, for vehicles like GM, Ford, , Honda. Machinery, hospital, petrochemical, and Aerospace etc.

Market

Europe, North America, Oceania

QC

Every order production will get more than 10 times regular check and 5 fives times random check by our professional QC. Or by Third party appointed by customer

 

Mold

Molding Process

Injection molding, mold processing, extrusion

Mould type

processing mold, injection mold, extrusionmold

Machines

350T vacuum pressing machine and other pressing machine at 300T,250T and so on

Tooling equipment

Rubber tension tester, Rubber vulcanization instrument, Durometer, calipers, ageing oven

Cavity

1~400 cavities

Mould Life

300,000~1,00,000 times

 

Production

Production capacity

finish each mold of product in 3 minutes and working on 3 shifts within 24 hours

Mold lead time

15~35 days

Sample lead time

3~5 days

Production time

usually 15~30 days, should be confirmed before order

Loading port

TIANJIN

If you are interested in our products, you can choose to leave your information here, and we will be in touch with you shortly.


Write your message here and send it to us

News

If you are interested in our products, you can choose to leave your information here, and we will be in touch with you shortly.


en_USEnglish